Publication
Metodologia SMED: estudo do trabalho e redução dos tempos de Setup
datacite.subject.fos | Engenharia e Tecnologia | pt_PT |
datacite.subject.fos | Engenharia e Tecnologia::Engenharia Mecânica | pt_PT |
dc.contributor.advisor | Paiva, Luís Manuel Gonçalves de | |
dc.contributor.author | Ferreira, Vítor Varela | |
dc.date.accessioned | 2018-10-25T08:04:03Z | |
dc.date.available | 2018-10-25T08:04:03Z | |
dc.date.issued | 2018-09-27 | |
dc.date.submitted | 2018-06-18 | |
dc.description.abstract | O presente Trabalho de Estágio constitui-se como parte integrante da estrutura curricular do Mestrado em Engenharia Mecânica e Gestão Industrial, e assume-se como um projeto dirigido ao desenvolvimento e melhoria operacional do processo produtivo na empresa Purever Industrial Solutions S.A. Acentuando-se os níveis de competitividade em contexto mundial, é hoje reconhecida a necessidade de as empresas se apresentarem extremamente disponíveis, no sentido de poderem dar rápidas respostas às solicitações do mercado, no cumprimento das especificidades e exigências dos múltiplos clientes. Neste âmbito, considerou-se como fundamental e de maior importância, definir como objetivo a aplicação da Metodologia SMED (Single Minute Exchange of Die), uma ferramenta do Lean Manufacturing, no intuito de se procurarem reduzir os tempos de setup das linhas de produção da empresa, tornando os processos operativos mais rápidos e flexíveis, com uma acentuada repercussão no nível de stocks intermédios. Acresce referir, que de uma forma subjacente, se fez a aplicação da Metodologia 5’S e Gestão Visual, que ao constituírem um precioso auxiliar na organização e sistematização dos processos, constituíram um fator facilitador e indispensável à aplicação do SMED. Finalmente, de realçar a projeção e o estudo da eficiência de dois equipamentos principais do processo produtivo da empresa - Máquinas de Ângulos, utilizando o indicador OEE (Overall Equipment Effectiveness), parte integrante da Metodologia TPM (Total Productive Maintenance), no sentido de permitir calcular os parâmetros de qualidade, cadência e desempenho, configurando a obtenção de valores indispensáveis a uma desejável análise e comparação com processos operativos industriais, possíveis de tomar como referência. | pt_PT |
dc.description.abstract | ABSTRACT: The present Work of Internship is an integral part of the curricular structure of the Master degree in Mechanical Engineering and Industrial Management, and is assumed as a project directed to the development and operational improvement of the productive process in the company Purever Industrial Solutions S.A. By emphasizing competitiveness levels in a global context, it is now recognized the need for companies to present themselves extremely available, in order to be able to respond quickly to market demands, in order to meet the specificities and requirements of multiple customers. In this context, it was considered as fundamental and of greater importance, to define as objective the application of the SMED Methodology, a tool of Lean Manufacturing, in order to try to reduce the setup times of the production lines of the business processes, making operating processes faster and more flexible, with a significant impact on the level of intermediate stocks. It is also worth mentioning that, in an underlying form, the 5'S Methodology and Visual Management were applied, which, as a valuable aid in the organization and systematization of the processes, constituted a facilitating and indispensable factor for the application of SMED. Finally, to highlight the projection and efficiency study of two main equipment of the company's production process - Angle Machines, using the OEE (Overall Equipment Effectiveness) indicator, an integral part of the TPM (Total Productive Maintenance) Methodology, in order to allow calculate the parameters of quality, cadence and performance, configuring the obtaining of values, indispensable to a desirable analysis and comparison with industrial operating processes, possible to take as reference. | pt_PT |
dc.identifier.tid | 201987120 | pt_PT |
dc.identifier.uri | http://hdl.handle.net/10400.19/5244 | |
dc.language.iso | por | pt_PT |
dc.subject | OEE-Overall Equipment Effectiveness | pt_PT |
dc.subject | SMED–Single Minute Exchange of Die | pt_PT |
dc.subject | Setup | pt_PT |
dc.subject | Lean Manufacturing | pt_PT |
dc.subject | Flexibilidade | pt_PT |
dc.subject | TPM–Total Productive Maintenance | pt_PT |
dc.title | Metodologia SMED: estudo do trabalho e redução dos tempos de Setup | pt_PT |
dc.type | master thesis | |
dspace.entity.type | Publication | |
rcaap.rights | openAccess | pt_PT |
rcaap.type | masterThesis | pt_PT |
thesis.degree.name | Engenharia Mecânica e Gestão Industrial | pt_PT |
Files
Original bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- Vítor_Ferreira_Dissertação de Mestrado.pdf
- Size:
- 4.8 MB
- Format:
- Adobe Portable Document Format
License bundle
1 - 1 of 1
No Thumbnail Available
- Name:
- license.txt
- Size:
- 1.79 KB
- Format:
- Item-specific license agreed upon to submission
- Description: